TMT Footing should have a minimum depth of 150mm for footing on soil, and minimum 300mm above the top of piles for footing on piles. Minimum clear cover for footings is generally 50mm.
Advantages
- Machine made with accurate shape and size
- No need of power connection at site for cutting rebars
- No on-site bending required
- No microcracks on the bends as proper mandrels are used
- Zero wastage of cut lengths
- Available in ready to use bundles at Tiscon Dealers
- Need only 2 days to finish foundation
Footing Sizes
- 1.3 meter used in 4”*4” footing
- 1.45 meter used in 4.5”*4.5” footing
- 1.6 meter used in 5”*5” footing
- 1.9 meter used in 6”*6” footing
The importance of footing:
To minimize the fabrication mistakes at a site, as well as to speed up the construction, and more importantly, to relieve you from unnecessary hassles, Tata Tiscon introduces “Tiscon Footing” – prefabricated rebar kit. These ready to fix kits are available at Tiscon dealer counters in select cities in 10 mm and 12 mm diameter. The availability of various sizes is shown in the image below.
What is a foundation
Any house building structure can be divided into two components:
Superstructure – Part of structure which is above ground level
Substructure/Foundation – Part of structure which is below ground level
Foundation generally comprises of three components:
Footing
Column
Tie beam